COMSA Service is awarded the renovation contract for the Spectacular Musical Fountain, in South Korea
COMSA Service, a COMSA Corporación company specialized in maintenance and energy efficiency, has been awarded the contract for the renovation of Goyang’s ‘Spectacular Musical Fountain’, located in Ilsan Park, 30 km north of Seoul (South Korea). The musical fountain, built in 2004 by COMSA Service, will come into operation in April 2022. The project consists […]
COMSA Corporación is awarded the renovation works for the Line 1 of Metrovalencia
The joint venture formed by COMSA and Lantania has been awarded the renovation works for the Line 1 of Metrovalencia commissioned by Ferrocarrils de la Generalitat Valenciana (FGV). The works will be developed in the section between the Valencia Sud and Villanueva de Castellón stations and will consist of the replacement of the existing turnouts […]
COMSA Corporación se une a la recogida de firmas del ACNUR contra el cambio climático
La lucha contra el cambio climático es un objetivo compartido de COMSA Corporación y el ACNUR. Por eso, la compañía apoya la recogida de firmas impulsada por la agencia de las Naciones Unidas para los Refugiados con el objetivo de exigir a la ONU y a los gobiernos medidas urgentes contra la crisis climática. ¿Sabías […]
COMSA Corporación will execute the new railway access to the T1 terminal of Barcelona-El Prat Airport
COMSA together with COMSA Industrial will be in charge of the second and last phase of the works for the new railway access to terminal T1 of Barcelona-El Prat Airport. The access will allow the establishment of direct suburban train services to both terminals T1 and T2 from Manresa (Barcelona) and Maçanet (Girona) through the […]
COMSA and Nortúnel complete the excavation of the Amagá Tunnel
COMSA and Nortúnel concluded last Friday, May 21st, the excavation of the right road of the Amagá Tunnel, located in the Southwest of Antioquia (Colombia). The works are part of the Pacific 1 4G Connection project, which seeks an alternate connection between the Eje Cafetero, Medellín and the port of Buenaventura. Last April, COMSA and Nortúnel already […]
COMSA begins the foundation works on the bridge over the Araguaia River in Brazil
COMSA has started the infrastructure and foundation works for the construction of the bridge over the Araguaia River, on the BR-080 highway, which will connect the states of Mato Grosso and Goiás in Brazil. Due to the complexity of the project, it will be necessary to drive 424 piles, 322 of which will be driven […]
Campaign to promote healthy habits at COMSA Corporación
In the occasion of the World Day for Safety and Health at Work, COMSA Corporación launches a campaign to promote healthy habits among all its employees. Over the coming months and aimed at the whole workforce, the plan will be developed through the following lines: CARDIOVASCULAR RISK PREVENTION According to the World Health Organization (WHO), cardiovascular disease is the leading […]
COMSA Corporación, committed to the construction and adaptation of health infrastructures
COMSA Corporación has boosted its presence in the healthcare infrastructure sector by participating in the development of hospital projects through three of its main business areas: Construction, Industrial Engineering and Maintenance, Conservation and Services. In the field of construction, COMSA is building the new Pediatric Cancer Centre at Sant Joan de Déu Hospital. The project […]
COMSA begins construction of Ehlis’ second logistics centre in Illescas
This morning took place the ceremony to lay the first stone of the new Elhis logistics centre in Illescas (Toledo), the most technologically advanced in the hardware sector in Spain, the construction of which will be carried out by COMSA Corporación. The event was attended by personalities from the political and economic spheres of the […]
COMSA Industrial is awarded a new engineering project on the Pacific Connection 3 Highway in Colombia
COMSA Corporación, through its Industrial division in Colombia, reinforces its commitment to responsible growth in 2021 and increases its activity in Latin America with the award of a new contract to carry out the design, supply, installation, and commissioning of the essential equipment for the control system and ITS (Intelligent Traffic Systems) of the Tesalia […]