COMSA Corporación

Leaders in infrastructures and engineering

COMSA Corporación works on the development of advanced, high-tech infrastructures in which innovation plays a fundamental role as a motor for growth and the generation of sustainable solutions.

Organigrama​

Comité de dirección y liderazgo de COMSA Corporación

D. Jorge Miarnau
Presidente y consejero delegado
D. Guillermo Lorenzo
CEO de Infraestructuras, Ingeniería y Servicios
D. Manel Fonseca
Director general de Servicios Económicos Financieros
D. Juan Enseñat
Director General de Infraestructuras
D. Pablo maset
Director de Ingeniería Industrial
D. Luis Álvarez
Director de Mantenimiento, conservación y servicios
D. Fernando Práxedes
Director de Concesiones

COMSA Corporación in figures

COMSA Corporación has consolidated its leadership in Spain with a business portfolio of over 2,000 million euros and a consolidated activity in the international market

Annual summary

COMSA Corporación annual sumary 2023

To find out about COMSA Corporación’s most outstanding projects, please consult the 2023 Annual Report.

Worldwide presence

COMSA Corporación has a consolidated activity in the international field.

Mechanical and controlling installations of the new Seat of Justice in Andorra.
Installation of the collection of photovoltaic solar energy in the Ordino’s Sports Centre.
Andorra

COMSA Corporación is established in Andorra through EM-T, an engineering company that has been operating for more than 40 years in the country. It is specialized in installations, industrial systems and telecommunications. In addition, it is leader in the installation of geothermal technology in buildings.

Railway line construction between Gradec and Sveti Ivan Zabno.
Improvement and electrification of an 18.7 km section of the railway line between Vinkovci and Vukovar.
Croatia

Specialization in railway infrastructure: construction, renovation and electrification of railway lines. One of the milestones of the corporation is the construction of the railway line between Gradec and Sveti Zabno, which is the first of new construction in the country for more than 50 years.

  • Railway overhaul and electrification between provinces of Vinkovci and Vukovar ($60,3M)
Construction of the Odense Tramway
Modernisation of air navigation systems at Nuuk, Ilulissat and Qaqortoq airports (Greenland)
Denmark

In northern Europe, COMSA Corporación executes and develops railway projects, both infrastructure construction and engineering and systems works.

  • Design and construction of the Odense Tramway (€158 million).
  • Modernisation of air navigation systems at Nuuk, Ilulissat and Qaqortoq airports (Greenland).
Construction of the Santa Cilia - Puente la Reina de Jaca section of the Pyrenees motorway (A-21) from Jaca to Pamplona (Huesca).
Construction of the Lugaritz-Miraconcha section of Metro de Donosti (Gipuzkoa)
Framework contracts for construction, equipment supply and maintenance of networks and infrastructure for Cellnex, CTTI, France Telecom, Iberdrola, Red Eléctrica and Vodafone.
Spain

Turnkey railway projects. Development of industrial engineering works. Comprehensive and multidisciplinary maintenance services. Promotion and concession of infrastructures. Management and development of renewable energy projects.

Turnover 2023
0 million Euros
Staff
0
Maintenance of ornamental fountains in Paris.
Maintenance of electrical installations in the seat of CERN in Prevessin.
Clean areas for a biosecurity laboratory in Brétigny-sur-Orge.
France

COMSA Industrial develops industrial engineering projects, the main ones being electrical and mechanical installations, as well as projects for the biopharma sector.

Through COMSA Service, the group performs maintenance of more than a hundred of ornamental fountains in the country.

  • Electrical installations and communication systems support in the seat of CERN in Prevessin ($74,9M)
Renovation of the Beira Alta line
Catenary maintenance on the Cacia platform
Portugal

Through FERGRUPO, execution of railway projects, both in terms of construction and track renewal and maintenance.

COMSA is also present in Portugal for the development of civil works and COMSA Industrial for engineering works.

  • Renovation of the Beira Alta line (74.7 M€)
  • Construction of the railway section between Évora Norte and Freixo (46.6 M€).
Construction of a mobile swing-open bridge in Ekerö
Widening of the road between the towns of Ekerö and Lindö
Sweden

Design and execution of infrastructure projects: roads, tunnels, bridges, as well as work on railway lines.

  • Design and construction of the access tunnels to the Stockholm bypass of the E4 motorway in Skärholmen (€33m).
  • Design and execution of the Ekerö road 261 project, including the construction of a mobile swing-open bridge.
Electrical installations, fibre-optic and communication systems support at CERN.
Cultural Centre of Lugano.
Switzerland

Industrial engineering projects: electromechanical installations, maintenance of telecommunications.

Execution of construction projects.

  • Electrical installations and communication systems support in the CERN seat in Meyrin ($74,9M).
Construction of the bridge over the Araguaia River
Second phase of São Paulo Metro Line 4
Brazil

Execution of major railway infrastructure projects: construction of metro lines, laying of railway sections, specialised maintenance.

Civil works: construction, improvement and extension of roads and motorways.

  • Second phase of Line 4 of the Sao Paulo Metro (€235m).
  • Duplication and renovation of a 78-kilometre section of the BR-101 highway in the state of Alagoas (€132 million).
Supply, installation and commissioning of the electromechanical equipment and communication systems for Túnel de la Línea, which is the longest of Latin America
Excavation, buttressing and lining of the Amagá tunnels on the Pacífico 1 motorway
Colombia

COMSA Corporación develops projects for the supply, installation and commissioning of electromechanical equipment, communication systems and ITS. It also executes works of big infrastructures like tunnels construction.

  • Execution of the Amagá tunnel of the Pacífico 1 motorway ($103M)
  • Supply, installation and commissioning of ITS systems for the tunnels of the road between Bolomolo, Camino C. and Ancón Sur ($20M)
Maintenance of the light train track system of Mexico City in the Tasquena-Estadio Azteca section.
Construction of 110 kilometers of the Libramiento Sur motorway in Guadalajar
Development of an air treatment system for the Birmex factory
Mexico

COMSA Corporación develops infrastructure projects: motorway and road construction, as well as railway execution, rehabilitation and maintenance.

Through EOLIS, the group executes industrial engineering projects: electromechanical and system installations.

  • Rehabilitation of the La Mata-Colonia Jordán section of the Istmo de Tehuantepec Railway ($30,5M)
Construction of the substation of Moyococha.
Peru

Electrical maintenance projects and works of the transport and distribution in high, medium and low tension network.

Installation of Navigation Aids system at the airports of Casablanca, Ben Slimane, Errachidia, Ifrane and Tan tan.
Solid's production plant of Spimaco in Casablanca.
Morocco

Construction of pharmaceutical production plants.

Aeronautic engineering projects: installation of air navigation systems.

Installations in airports: supply, installation, commissioning and maintenance of telescopic boarding bridges.

  • Supply, installation and commissioning of landing systems (ILS) and distance measurement equipment (DME) at 14 airports of Morocco ($15,4M)